Renovation project of melting furnace and holding furnace
In the renovation project of melting furnace and holding furnace, the 15 t furnace is transformed into the 30 t furnace, so that the furnace body is upgraded, and the thermal efficiency is improved. On average, the gas consumption per ton of cast-rolling coil is reduced by 3 m3. According to the annual melting of 26,000 t aluminum ingots in each furnace, 78,000 m3 natural gas can be saved annually. Half of the furnaces are designed with electronic stirring. Adding an electronic stirring device can shorten the aluminum melting time of aluminum melting furnaces by 30 min, thus reducing the gas consumption of each furnace by 3 m3, reducing the power consumption by 16 kWh, increasing the output from 3 furnaces per day to 3.4 furnaces, and greatly improving the production efficiency.